Personalized customization drilling rig machine

description1
Zipper closure 1/5 zip athletic pullovers for men. Stretchy, lightweight, fast-drying fabric for superior performance. REGULAR FIT - US standard sizes. An athletic fit that sits close to the body for a wide range of motion, designed for optimal performance and all day comfort. FEATURES - Quarter zip closure;Thumbholes on long sleeves to keep them in place during workout
Overview
Quick Details
Condition: New Warranty: 1 Year
Applicable Industries: Construction works , Energy & Mining Weight (KG): 6500
Showroom Location: None Video outgoing-inspection: Provided
Machinery Test Report: Provided Marketing Type: Hot Product 2022
Warranty of core components: 1 Year Core Components: Engine, Motor, Pump
Place of Origin: Jiangsu, China Brand Name: ANMAN
UNIQUE SELLING POINT: Custom-built model
Supply Ability
Supply Ability 100 Set/Sets per Month
Packaging & Delivery
Packaging Details Drilling rig naked, other accessories carton packaging Port Shanghai Port
Product Detail
Successful Subject 1
Changtai Open Caisson Project
 

          It is a kind of equipment used to break the soil in the blind area of large open caisson. The largest bridge construction company in China proposed to our company that a scheme that can break the soil under the shaft wall of large open caisson is needed.

          According to the site investigation, the project team of the company put forward the scheme of "open caisson blind area borrow system".

         After theoretical verification in the factory and field test, a complete set of equipment and construction scheme have been formed and successfully applied to the largest open caisson in China. The open caisson is 65m wide, 90m long and 70m deep.

         The customer said, "it is the first time to realize the controllable and efficient sinking of large open caisson in the sinking process."

 

 

Customized parameters according to customer requirements

 

 

 

 

CCTV Reports

"New technologies ensure the steady progress of major projects"

 

 
Successful Subject 2
Changtai Open Caisson Project

 

 

 

 

STEP 1

 
Scheme principle
 

 

 

 

 

STEP 2

 

Assembly and commissioning
 
 

        A kind of equipment for mud cake cleaning of cutter head of large shield machine was proposed to Anman by China's largest tunnel construction company.

        When a shield machine with a diameter of 15.7m crosses the Shiziyang ocean, it encounters clay, which is easy to form mud cake at the cutter head, resulting in the reduction of the propulsion efficiency of the shield machine. I hope we can solve it.

        The next day after receiving the task, our project team rushed to the project site 2000 kilometers away and put forward the scheme of high-pressure flushing that night.

        According to the size of the shield machine, the corresponding three-dimensional scheme drawing was issued, and the full set of products were delivered within 45 days after signing the contract.

        The customer thinks that the propulsive efficiency of the backing construction machine in the clay layer is increased by 2 times by adopting our scheme. Subsequently, a series of orders were added.

 
R & D project achievement report

CONTACT US